Skip to content

Battery Bank Series-Parallel Calculator

Verified Last reviewed: 22 November 2026. Page history

How are the batteries wired?

Your battery bank

How the numbers work

      Notes and how it works

      Battery voltage

      The nominal voltage printed on one battery, not the bank.

      Capacity of one battery (Ah)

      Amp-hours from the label, usually the 20-hour rate.

      Number of batteries

      Whole batteries only, 1 to 64. All of them must be identical.

      Batteries in each series string

      Series-parallel only. It must divide the battery count exactly.

      Series

      Series adds voltage. Parallel adds capacity. Series-parallel does both, in strings.

      Battery chemistry

      Sets the recommended depth of discharge below.

      Depth of discharge to plan with (%)

      50% for lead-acid, 100% for LiFePO4. Blank means the chemistry's recommended figure.

      Largest continuous load (amps, optional)

      The biggest current the bank must carry for a sustained period. Adds a cable gauge and a minimum fuse size from Trojan's table.

      This tool estimates battery bank voltage, capacity, and usable energy from the numbers you enter, for general guidance only. It is not electrical advice. A battery bank can deliver thousands of amps into a short circuit and can cause fire, burns, or explosion if wired wrong. Check every result against your battery maker's data sheet, size cables and fuses to the National Electrical Code, and have a qualified electrician check any bank you are unsure about.

      Free to use — no sign-up, no paywall. Spotted a mistake? Tell us — we fix reported errors within 24 hours.

      Your inputs stay in your browser: every calculation runs on your device, and nothing you type is sent to our servers.

      Four 12 volt 100 Ah batteries wired as two strings of two in series-parallel make a 24 volt, 200 Ah bank holding 4,800 watt-hours. Series wiring adds voltage and keeps capacity at one battery; parallel wiring adds capacity and keeps voltage at one battery. Lead-acid batteries give about half their rated capacity in regular use, because Trojan and Rolls recommend a 50 percent depth of discharge and cap it at 80 percent, while Battle Born rates its LiFePO4 batteries at 100 percent usable depth of discharge. A 12 volt LiFePO4 battery runs at 12.8 volts nominal, so it holds 1,280 watt-hours per 100 amp-hours, not 1,200. Trojan allows at most three parallel strings in a lead-acid bank. Size the main fuse to at least 125 percent of the continuous load and put it within 7 inches of the battery. Enter your battery details above for the bank voltage, capacity, usable energy, cable gauge, and fuse size.

      Last reviewed: 22 November 2026. Reviewed every 180 days; next review due 22 May 2027.

      How to use the Battery Bank Series-Parallel Calculator

      Enter the details of one battery, say how many you have and how they are wired, and the calculator gives you the bank voltage, the bank capacity in amp-hours, the total energy in watt-hours and kilowatt-hours, and the usable energy at the depth of discharge you plan to use. It also counts the interconnect cables, estimates the short-circuit current the main fuse must interrupt, and, when you enter a load current, sizes the cable and the minimum fuse from Trojan's published table.

      1. Battery voltage. Pick the nominal voltage printed on one battery: 6, 12, 24, or 48 volts. This is the voltage of a single battery, not the bank you want.
      2. Capacity of one battery. Enter the amp-hour rating from the label, usually the 20-hour rate. A common deep-cycle battery is 100 Ah; the classic Trojan T-105 golf cart battery is 225 Ah at 6 volts.
      3. Number of batteries. Enter how many identical batteries are in the bank, from 1 to 64. Every battery in a bank must be the same make, model, capacity, and age.
      4. Wiring. Choose series, parallel, or series-parallel. Series adds voltage. Parallel adds capacity. Series-parallel does both, in strings.
      5. Batteries in each series string. For a series-parallel bank only, enter how many batteries sit in each string. The number must divide your battery count exactly: 4 batteries split into 2 strings of 2, not strings of 3.
      6. Chemistry and depth of discharge. Pick flooded, AGM, gel, or LiFePO4. The depth of discharge fills in from the chemistry: 50 percent for lead-acid, 100 percent for LiFePO4. Change it if you plan to cycle shallower or deeper, and the tool warns you when you pass the maker's recommended or maximum figure.
      7. Largest continuous load (optional). Enter the biggest current the bank must carry for a sustained period, in amps. The tool then gives you a minimum fuse size and the smallest cable gauge in Trojan's table that carries it.

      The results appear as you type, and the button recalculates without reloading the page. Every figure comes with the working shown, so you can check the arithmetic by hand before you buy cable or crimp a lug.

      How it works

      A battery bank is just batteries wired together so they behave as one bigger battery. Two rules govern everything, and they come straight from Trojan's User's Guide: to increase voltage, connect batteries in series, which does not increase the system capacity; to increase capacity, connect batteries in parallel, which does not increase the system voltage. Series-parallel wiring combines the two: batteries in series form strings at the voltage you want, and strings in parallel add capacity at that voltage.

      Series. Wire the positive terminal of one battery to the negative terminal of the next. The voltages add and the amp-hours stay at one battery. Four 12 volt 100 Ah batteries in series make a 48 volt, 100 Ah bank.

      Parallel. Wire all the positive terminals together and all the negative terminals together. The amp-hours add and the voltage stays at one battery. Four 12 volt 100 Ah batteries in parallel make a 12 volt, 400 Ah bank.

      Series-parallel. Build two or more series strings, then wire the strings in parallel. Four 12 volt 100 Ah batteries as two strings of two make a 24 volt, 200 Ah bank: each string is 24 volts at 100 Ah, and the two strings together hold 200 Ah.

      Energy. Watt-hours are bank voltage times bank amp-hours. A 24 volt, 200 Ah bank holds 4,800 Wh, or 4.8 kWh. That number is the same however you wire the same batteries: four 12 volt 100 Ah batteries always hold 4,800 Wh in total, whether they are arranged as 48 volts at 100 Ah, 24 volts at 200 Ah, or 12 volts at 400 Ah. Wiring changes the shape of the energy, not the amount.

      Usable energy. No battery gives up all of its rated energy in regular use, and how much you can take depends on the chemistry. For lead-acid batteries of every type, flooded, AGM, and gel, Trojan's User's Guide says renewable-energy systems are typically designed for a 20 to 50 percent depth of discharge and tells owners not to discharge past 80 percent. Rolls Surrette says the same in its user manual: off-grid systems are typically sized to operate between 20 and 50 percent depth of discharge, with 50 percent the maximum for the balance between capacity and cycle life, and 80 percent acceptable only for grid-connected backup systems that cycle infrequently. Lifeline, a major AGM maker, rates its batteries at 1,000 to 1,100 cycles at a 50 percent depth of discharge. This calculator therefore plans lead-acid banks at 50 percent usable capacity and warns you when you plan deeper.

      The price of deep discharging is measured in cycles. Trojan's published cycle-life curve for the T-105 gives roughly 3,000 cycles at a 20 percent depth of discharge, roughly 1,200 cycles at 50 percent, and roughly 500 cycles at 80 percent. Discharging to 80 percent every day does not just use more of the battery, it uses up the battery much sooner. Shallow cycling is the cheapest energy a lead-acid bank ever delivers.

      LiFePO4 is different. Battle Born's data sheet for its BB10012 12 volt 100 Ah lithium iron phosphate battery, revised 8/12/2026, prints a usable depth of discharge of 100 percent and 3,000 to 5,000 deep discharge cycles. A 100 Ah LiFePO4 battery therefore gives you about twice the usable energy of a 100 Ah lead-acid battery planned at 50 percent. Battle Born also allows series wiring up to 48 volts and sets no limit on the number of batteries wired in parallel. This calculator plans LiFePO4 banks at 100 percent usable capacity and warns you if the bank voltage passes 48 volts in series.

      The 12.8 volt wrinkle. A 12 volt LiFePO4 battery is not really a 12 volt battery. Its four cells run at 3.2 volts each, so the nominal voltage is 12.8 volts, and Battle Born rates the 100 Ah battery at 1,280 Wh, not the 1,200 Wh that 12 volts times 100 amp-hours suggests. The headline figures in this calculator use the voltage you enter, so the math stays transparent, but for LiFePO4 banks it also shows the energy at the maker's 12.8 volt nominal voltage, so you are not short-changed by about 7 percent when you compare lithium with lead-acid.

      How many strings. Trojan's User's Guide allows a maximum of three parallel strings, and its glossary defines a battery bank as one string or up to three strings in parallel. Trojan's own technical support has said the same in writing: with more than three strings, choose a higher-capacity battery instead. Extra strings hide a weak string until it is too late, because the healthy strings carry the load and mask the failing one. This calculator warns you whenever a lead-acid bank has more than three strings. The limit does not apply to LiFePO4, where Battle Born sets no parallel limit.

      Cable and fuse sizing. When you enter a load current, the calculator sizes the fuse first: at least 125 percent of the expected continuous load, the rule MarineHowTo publishes following ABYC practice. It then picks the smallest cable in Trojan's ampacity table that carries the fuse current, not just the load, so the fuse can never outrun the cable it protects. Trojan's table, for cable runs under 6 feet, runs from 14 AWG at 25 amps through 10 AWG at 40 amps, 6 AWG at 75 amps, 2 AWG at 130 amps, and 1/0 AWG at 170 amps, up to 4/0 AWG at 360 amps. If your load needs more than 4/0 AWG, the calculator says so and suggests splitting the load across parallel runs or raising the bank voltage. Longer runs need heavier cable for voltage drop, which this calculator does not check: size long runs to the National Electrical Code.

      Short-circuit current. A battery bank can deliver thousands of amps into a dead short, and the main fuse must be able to interrupt that current or it can weld shut instead of clearing. ABYC publishes planning figures for this: about 3,000 amps per 100 Ah for flooded lead-acid batteries and about 5,000 amps per 100 Ah for AGM, gel, and lithium. The calculator multiplies your bank capacity by the figure for your chemistry and warns you when the result passes the interrupting rating of a common fuse type: an ANL fuse interrupts about 6,000 amps, an MRBF about 10,000 amps, and a Class T fuse about 20,000 amps.

      Worked examples

      Example 1: the RV bank. Four 12 volt 100 Ah flooded batteries, wired as two strings of two in series-parallel, make a 24 volt, 200 Ah bank. Total energy is 24 volts times 200 amp-hours, which is 4,800 Wh. At the 50 percent depth of discharge Trojan recommends, 2,400 Wh is usable, or 100 Ah. The bank needs 2 series links and 1 parallel link, plus 2 main leads, 5 cables in all. Into a dead short it could deliver about 6,000 amps, which an ANL fuse can just interrupt.

      Example 2: the golf cart pair. Two Trojan T-105 batteries, 6 volts and 225 Ah each, wired in series make a 12 volt, 225 Ah bank holding 2,700 Wh. At 50 percent depth of discharge, 1,350 Wh is usable. Add a second pair as another string and the bank becomes 12 volts at 450 Ah, holding 5,400 Wh with 2,700 Wh usable. Eight T-105 batteries as two strings of four make a 24 volt, 450 Ah bank holding 10,800 Wh, the size of a small off-grid solar bank.

      Example 3: the lithium upgrade. Four 12 volt 100 Ah LiFePO4 batteries in series make a 48 volt, 100 Ah bank holding 4,800 Wh on the entered voltage, and 5,120 Wh at the maker's 12.8 volt nominal voltage. At the 100 percent usable depth of discharge Battle Born prints on the data sheet, all of it is usable: 4,800 Wh against the 2,400 Wh a lead-acid bank of the same four batteries would give at 50 percent. That is the whole lithium argument in one number, and it is why a lithium bank half the size can replace a lead-acid bank.

      Example 4: sizing cable and fuse. Take the RV bank from Example 1 and add a 100 amp continuous load, a 2,400 watt inverter running near full power at 24 volts. The fuse must be at least 100 amps times 1.25, which is 125 amps. The smallest cable in Trojan's table that carries 125 amps is 2 AWG, rated 130 amps for runs under 6 feet. A 150 amp fuse on that cable would be wrong: the fuse would allow more current than the cable can carry.

      Features

      • All three wiring layouts. Series, parallel, and series-parallel, with the string layout spelled out so you can see exactly how the bank is built.
      • Usable capacity by chemistry. Flooded, AGM, gel, and LiFePO4 each get the depth of discharge their makers publish: 50 percent recommended and 80 percent maximum for lead-acid, 100 percent usable for LiFePO4, with warnings when you plan past the recommended or maximum figure.
      • The LiFePO4 nominal voltage correction. Lithium banks show energy at the maker's 12.8 volt nominal voltage alongside the entered-voltage figures, so a 100 Ah LiFePO4 battery correctly reads 1,280 Wh.
      • Cable and fuse sizing. Enter a load current and get a minimum fuse size at 125 percent of the load plus the smallest cable gauge in Trojan's ampacity table that carries it, with a clear warning when the load passes 4/0 AWG.
      • Short-circuit current estimate. The bank's dead-short current from ABYC planning figures, with a fuse-type warning when it passes what an ANL or MRBF fuse can interrupt.
      • String-count warning. Lead-acid banks with more than three parallel strings get Trojan's warning, with the advice to use higher-capacity batteries instead.
      • Interconnect count. The number of series links, parallel links, and main leads, so you know how many cables and lugs to buy.
      • Every step shown. The full working is printed under the result, so you can verify each number by hand before you wire anything.
      • Private by design. All math runs in your browser. Nothing is sent to any server, and the page works offline once it has loaded.

      Use cases

      Off-grid solar. Solar installers size banks in 12, 24, or 48 volt blocks to match the inverter, and the string count decides whether the design is sound. Use this calculator to check that a proposed bank reaches the inverter voltage with three strings or fewer, then size the whole system with the Off-Grid Solar and Battery Bank Sizer.

      RVs and camper vans. A van with two 6 volt golf cart batteries in series has a 12 volt bank; adding a second pair doubles the usable energy without changing the voltage. Run the numbers before you buy the second pair, and check how long the bank runs your loads with the Solar Battery Backup Runtime Calculator.

      Boats. Marine house banks live under ABYC E-11, which asks for overcurrent protection within 7 inches of the battery. The short-circuit estimate in this calculator tells you whether an ANL fuse is enough or whether the bank needs an MRBF or Class T fuse.

      Home backup power. A 48 volt LiFePO4 bank behind an inverter is the standard shape for home backup. The calculator confirms the voltage, the usable kilowatt-hours at 100 percent depth of discharge, and the cable gauge for the inverter's full-load current. For a UPS-style setup, the UPS Runtime Size Calculator checks the runtime side.

      Golf carts and utility vehicles. A 48 volt cart needs eight 6 volt batteries in series, or four 12 volt batteries. The calculator shows both arrangements hold the same energy when the amp-hours match, and shows what changes when they do not.

      Workshops and trolling motors. A 24 volt trolling motor needs two 12 volt batteries in series, and the usable amp-hours decide how long you fish. A 36 volt motor needs three. The calculator keeps the voltage and the usable capacity in one place.

      Safety: wiring a bank without hurting yourself or the batteries

      Batteries store enough energy to start a fire, melt a wrench, or blind you with acid, and a bank multiplies all three risks. Work with the main disconnect open, take off rings and watches, use insulated tools, and wear eye protection. Flooded batteries give off hydrogen gas while charging, so charge them in a ventilated space with no sparks or flames nearby, exactly as Trojan's User's Guide warns.

      Identical batteries only. Every battery in a bank must be the same make, model, capacity, and age, at the same state of charge. Trojan's technical support warns that mixing old and new batteries unbalances every string and shortens the life of the whole bank: the old battery's higher internal resistance and lower capacity drag the new one down to its level. Never mix chemistries in one bank. Flooded, AGM, and gel batteries want different charging, and lithium needs a battery management system that lead-acid charging can damage.

      Charge before you connect. Charge each battery fully on its own before the first parallel connection, and connect them only when a meter shows matched voltage. A fully charged battery wired to a flat one can drive a large equalizing current through the cables the moment they touch.

      Equal cables, torqued terminals. Keep all series cables the same length and all parallel cables the same length, so every string has the same resistance and shares the load evenly. Torque the terminals to the maker's figures: Trojan's guide lists 95 to 105 inch-pounds for its common terminal types, and 120 to 180 inch-pounds for stud terminals.

      Fuse the positive cable close to the battery. ABYC E-11 asks for overcurrent protection within 7 inches of the battery, measured along the wire, with 40-inch and 72-inch allowances only when the cable is sheathed or enclosed along its whole length. The fuse protects the cable, so its rating must never exceed the cable's ampacity, and it must be able to interrupt the short-circuit current the bank can deliver. Never put a fuse, breaker, or switch inside a battery compartment, where corrosion and explosive gas make it a hazard of its own.

      Respect the voltage. Banks above 48 volts need equipment, fuses, and disconnects rated for the voltage, and LiFePO4 batteries must never be wired in series past 48 volts: Battle Born caps series wiring at 48 volts on the BB10012 data sheet. If your design needs more than 48 volts, use batteries built for it, not more 12 volt batteries in a longer string.

      Sources

      • Trojan Battery User's Guide: recommended and maximum depth of discharge, the three-parallel-string limit, the cable ampacity table, torque values, and temperature effects on capacity. Trojan Battery User's Guide (PDF)
      • Trojan Battery Solar Industrial Line User's Guide: renewable-energy systems typically designed for a 20 to 50 percent depth of discharge. Trojan Battery User's Guide, connecting batteries section
      • Battle Born BB10012 data sheet, revision 8/12/2026: 100 percent usable depth of discharge, 3,000 to 5,000 deep discharge cycles, series wiring up to 48 volts, no limit in parallel, 1,280 Wh for a 12 volt 100 Ah battery. Battle Born BB10012 Data Sheet (PDF)
      • Rolls Surrette user manual: off-grid systems sized to 20 to 50 percent depth of discharge, 80 percent acceptable only for infrequently cycled grid backup. Rolls Surrette User Manual, depth of discharge section
      • Lifeline Batteries: AGM batteries rated at 1,000 to 1,100 cycles at a 50 percent depth of discharge. Lifeline RV Batteries
      • Blue Sea Systems, DC Circuit Protection: the ABYC E-11 7-inch, 40-inch, and 72-inch overcurrent protection rules. Blue Sea Systems DC Circuit Protection
      • MarineHowTo, Battery Banks and Over Current Protection: fuse sizing at 125 percent of continuous load, short-circuit planning figures of 3,000 amps per 100 Ah for flooded and 5,000 amps per 100 Ah for AGM and lithium, and interrupting ratings for ANL, MRBF, and Class T fuses. MarineHowTo Battery Banks and Over Current Protection

      Frequently asked questions

      How do I wire batteries in series and parallel?

      In series, connect the positive terminal of one battery to the negative terminal of the next. The voltages add and the capacity stays at one battery, so two 12 volt 100 Ah batteries in series make 24 volts at 100 Ah. In parallel, connect all the positive terminals together and all the negative terminals together. The capacities add and the voltage stays at one battery, so the same two batteries in parallel make 12 volts at 200 Ah. Series-parallel wiring builds series strings first, then wires the strings in parallel, which raises both the voltage and the capacity.

      What does 4 12V 100Ah batteries in series-parallel give you?

      Two strings of two batteries make a 24 volt, 200 Ah bank holding 4,800 Wh. At the 50 percent depth of discharge Trojan recommends for lead-acid batteries, 2,400 Wh is usable. The same four batteries wired all in series would give 48 volts at 100 Ah, and all in parallel would give 12 volts at 400 Ah. All three arrangements hold the same 4,800 Wh in total.

      How much usable capacity does a lead-acid battery bank really have?

      Plan on half. Trojan's User's Guide says renewable-energy systems are typically designed for a 20 to 50 percent depth of discharge and tells owners not to discharge past 80 percent, and Rolls Surrette says the same. A 100 Ah lead-acid battery therefore gives about 50 Ah of regular usable capacity. Discharging deeper costs cycles: Trojan's cycle-life curve for the T-105 gives roughly 1,200 cycles at 50 percent depth of discharge and roughly 500 at 80 percent.

      Can I use 100 percent of a LiFePO4 battery?

      Yes, if the maker says so. Battle Born's data sheet for its BB10012 12 volt 100 Ah battery prints a usable depth of discharge of 100 percent and 3,000 to 5,000 deep discharge cycles. That is why a 100 Ah LiFePO4 battery gives about twice the usable energy of a 100 Ah lead-acid battery planned at 50 percent. Check your own battery's data sheet, because not every lithium battery is rated the same way.

      Can I mix old and new batteries in one bank?

      No. Every battery in a bank must be the same make, model, capacity, and age, at the same state of charge. Trojan's technical support warns that mixing old and new batteries unbalances every string and shortens the life of the whole bank, because the old battery's higher resistance and lower capacity drag the new one down. The same rule bars mixing chemistries: flooded, AGM, gel, and lithium batteries charge differently and must never share a bank.

      How many batteries can I wire in parallel?

      For lead-acid banks, Trojan's User's Guide allows a maximum of three parallel strings, and says to choose a higher-capacity battery instead of adding a fourth string. Extra strings hide a weak string until it is too late. For LiFePO4, Battle Born sets no limit on the number of batteries wired in parallel. Either way, charge each battery fully on its own before the first parallel connection, and connect them only when a meter shows matched voltage.

      What size fuse and cable does my battery bank need?

      Size the fuse to at least 125 percent of the expected continuous load, and size the cable so its ampacity is at least the fuse rating. Trojan's table, for runs under 6 feet, runs from 14 AWG at 25 amps to 4/0 AWG at 360 amps. Put the fuse on the positive cable as close to the battery as practical: ABYC E-11 asks for overcurrent protection within 7 inches of the battery on boats. The fuse must also be able to interrupt the bank's short-circuit current, which is about 3,000 amps per 100 Ah for flooded batteries and 5,000 amps per 100 Ah for AGM, gel, and lithium.

      Why does my 12V LiFePO4 battery hold 1,280 Wh instead of 1,200 Wh?

      Because a 12 volt LiFePO4 battery runs at 12.8 volts nominal. Its four cells run at 3.2 volts each, so the real voltage is 12.8, and 12.8 volts times 100 amp-hours is 1,280 Wh. Battle Born prints 1,280 Wh on the BB10012 data sheet. Lead-acid batteries are rated at their nominal 12 volts, so the same 100 Ah reads 1,200 Wh. This calculator shows both figures for lithium banks so the comparison stays honest.

      Page history
      • — Published (saleem891@gmail.com)